The Vendor's Quote Covers the Build. It Rarely Covers Moving Your Data Into It.
The quote you signed and the project you got
A school replaces its ad-hoc Google Sheets and Access database with a real admissions dashboard. A clinic moves off a legacy practice-management tool onto something modern. A manufacturer swaps a 15-year-old inventory system for a web app that actually talks to their accounting software. In every case, the proposal reads clean: discovery, design, build, testing, launch, support. The number at the bottom feels honest because the scope looks honest.
Then the project starts, and the first real conversation is about the data. Not the schema the new system wants — the data you actually have. Three exports from three different eras of a legacy tool, each with slightly different column names. A spreadsheet that's been hand-edited by four different staff members over six years, with merged cells, inconsistent date formats, and a "notes" column that's really five different fields mashed into one. PDFs of old forms that were never entered into any system at all. This is normal. It's also, almost always, work nobody quoted.
Why migration gets left off the quote
It's not that vendors are hiding the cost. It's that migration is genuinely hard to estimate before anyone has looked at your actual data, and most proposals are written before that look happens. A vendor can scope "build a dashboard with these six views" from a conversation. They cannot scope "clean and import eleven years of inconsistent records" without first opening the files — and most sales conversations don't get that far before a contract is signed.
There's also a quieter reason: migration doesn't photograph well. It doesn't produce a demo screen you can show a stakeholder. A vendor's incentive, reasonably, is to spend proposal time on the parts of the project that make the sale, and migration isn't one of them. That doesn't make it optional work — it makes it work that gets discovered mid-project instead of priced upfront.
What actually drives the cost
Migration cost isn't a function of record count. A hundred thousand clean, consistently formatted rows migrate faster than five thousand messy ones. The cost drivers are:
- Number of source systems. One clean export is a script. Four overlapping exports from tools that were used inconsistently over the years means reconciling which record is the current truth when they disagree.
- How much is unstructured. Free-text fields, scanned documents, and "notes" columns that encode several different facts in one string all need a human decision about where that information goes, not just a transformation rule.
- Whether the data has ever been validated. A field called
graduation_yearthat actually contains years, blank entries, and the occasional typed-in "TBD" needs someone to decide what happens to the TBDs before any script can run. - How much history matters. If you only need current records, migration is smaller. If an institution is legally or operationally required to keep historical records queryable — common for schools and healthcare — the migration has to preserve structure you may not have needed to look at carefully in years.
None of this is unusual or a sign that your organization's data is unusually bad. It's what six or more years of a small team using a tool without strict data entry rules actually produces. The mistake isn't having messy data. The mistake is assuming someone priced the cleanup before you signed.
What to ask before you sign, not after
The fix isn't a bigger contingency line you hope you don't need. It's getting the migration scoped before the contract is final, which means doing a small piece of it early:
- Ask the vendor to look at a real export, not a description of one, before finalizing price. "We have about 8,000 student records in a FileMaker database" tells a vendor nothing about cost. An actual CSV export tells them a lot.
- Ask explicitly whether migration is in scope or billed separately, and get that answer in writing, not in a conversation. "We'll handle your data" in a sales call and "data migration, up to X hours, additional hours billed at Y" in the contract are different commitments.
- Ask what happens to records the migration can't automatically map. Someone has to decide what to do with the row that doesn't fit the new schema. That's either your staff's time or the vendor's — decide which, in advance, instead of discovering it during week six.
- Ask for a small migration pilot on a real but limited slice of data before committing to the full build. Migrating 200 real records surfaces the actual edge cases in your data in a day. Migrating the full dataset for the first time during go-live week surfaces them when you have the least room to fix them.
The takeaway
A software quote that doesn't separately price data migration isn't necessarily hiding anything — it may just not have looked yet. Treat that quote as provisional until a vendor has opened an actual export from your current system and told you, specifically, what in it will need cleanup. That conversation, had before the contract is signed, is the difference between a migration that's a line item and one that's a crisis in week six.